Toronto, Brampton, Barrie, Guelph, Southern Ontario

(416) 918-5707

Industrial Epoxy Floor Painting Toronto, Mississauga, Guelph, Barrie, Gta.

Traffic Line Painting, Parking Lots, Painting in Toronto Serving Toronto, Gta, and Southern Ontario.

 
We are Parking lot line painting contractors,  the total repainting of underground parking lots/ Parking lot line striping / Floor line Painting Underground parking line striping 

/ Non slip epoxy floor coatings / Warehouse line painting.
Serving Toronto, Gta and Southern Ontario. Traffic Line Painting in Toronto Parking Lot Lines Painting in the Toronto area.


How long does traffic paint take to dry.


The dry time for your striping job varies according to which materials you use.  However, let’s assume you’re using waterborne paint:

  • Paint is normally drivable after one hour – in a hot summer day in the sun it’s dry to the touch in under 60 seconds.
  • Lines are totally cured in about four hours, depending on weather conditions
  • Colder weather and lack of direct sunlight can lengthen dry time
  • In colder weather, solvent based traffic paint is recommended

Whenever we talk about “normal” or “typical” conditions, we’re thinking about temperatures over 50 degrees Fahrenheit.